| Interior floor with glue-down carpet |
Carpet being removed |
Carpet pad being removed |
Glue removal process |
 |
 |
 |
 |
| Glue removal process |
Glue being removed |
Glue Removal |
Glue Removal |
 |
 |
 |
 |
| Cracks in concrete showing after glue removal |
Large cracks in concrete repaired |
Surface cracks can be repaired or left depending on design |
Tack strip damage & large crack repaired |
 |
 |
 |
 |
| Tack strip damage repaired |
Tack strip damage repaired |
Floor is cleaned and prepared for overlay |
Skim coat overlay being applied |
 |
 |
 |
 |
| Skim coat process |
Skim coat applied over entire floor |
Skim coat application |
Lines drwan for scoring |
 |
 |
 |
 |
| Scoring design completed |
Scoring process with concrete saw |
Scoring |
Scoring pattern over entire floor |
 |
 |
 |
 |
| Scoring being completed |
Interior floor with glue-down carpet |
Scoring being completed |
Walls being protected for staining process |
 |
 |
 |
 |
| Ready for stain |
Ready for stain |
Floors cleaned & ready for stain |
1st application of acid stain |
 |
 |
 |
 |
| Acid stain being applied |
Acid stain applied & drying |
Additional color applied |
Primer applied & allowed to cure |
 |
 |
 |
 |
| Stencil design applied to floor |
Stencil ready for application |
Applying color-coat to stencil |
Stencil removal in progress |
 |
 |
 |
 |
| Stencil is ready to be sealed with primer |
Stencil sealed with primer |
Entire floor is sealed with high performance polyurethane |
Walls are painted and glazed |
 |
 |
 |
 |
| Furniture is moved back into room |
Furniture moved back into room |
Floors completed and cured, ready to use |
Completed floor, ready to use |
 |
 |
|
|
| Completed project |
All furniture in, ready to use |
|
|